| |
|
|
|
Apartments
The apartments are offered in three stages of completeness
1. - outer plaster with heat insulation, PVC joinery work
2.Completed - painted walls and flooring, setting of faience in the bath according to the purcasher
3.Fully completed - with furniture
The hotel is built with steel-concrete construction, red bricks. There is a main street near the building.
The place is situated 300 m away from the beach, next to the gas station.
Download: 30_05_2007_plosti-01.doc
|
 1°C (Óñåùà ñå -5°C) |
|
|
|
|
|